This d i y video shows how to build a shower pan pre slope on a concrete slab or pre pitch or how to install a mortar shower pan for a custom ceramic tile a.
													
																	Shower floor pitch. 
									
	
		
	
																	To efficiently drain the recommended minimum slope for a shower floor is about 4 percent or a 1 2 inch drop per every 12 inches from the shower walls to the drain. 
																	From the floor drain. 
																	Included in each package is one each center ring and 6 each standard float sticks 1 in. 
																	Our store associates are happy to help you weigh the options and choose the perfect tile for your shower. 
															
													
									
	
		
	
																	Length that attach in any of the 24 slots on. 
																	Taper x 36 in. 
																	With quick pitch this is easily accomplishable. 
																	To determine the proper slope measure from the drain to each wall and figure a quarter inch of slope per foot of length. 
															
													
									
	
		
	
																	Creates the proper code required sub floor pitch. 
																	To 1 3 4 in. 
																	Sticks measure 1 8 in. 
																	For standard shower sub floor areas with a centered drain or custom shower areas where the drain is within 36 in. 
															
													
									
	
		
	
																	Screws and tape included. 
																	Sold 6 per package. 
																	The mortar bed on top of the membrane is exactly the same thickness along the walls as it is at the drain. 
																	Quick pitch is a revolutionary new product that will completely change the way in which a mortar bed is installed. 
															
													
									
	
		
	
																	Insures proper pan liner drainage. 
																	If the wall is 3 feet from the drain the cement should rise by 3 4 inches as it goes from the drain to the wall starting at the half inch depth around the drain for a total height of 1 1 4 inches at the wall. 
																	Ansi a108 01a section 2 3 6 requires that the mortar. 
																	Before we begin please understand that in a conventional mortar bed shower floor the slope of the floor comes from the sloped fill or pre slope which is under the shower pan membrane. 
															
													
									
	
		
	
																	In order to install a proper shower floor the base of the shower has to have a proper slope for drainage. 
																	Quick pitch standard kit permits construction of a standard 36 in. 
																	Taper x 36 in.